20056 - Nora Davis Elementary Additions and Renovations
Base bid work will include all work to construct a new 26,000 square foot one story addition, all renovation work to the existing buildings described in the insurance documents, as well as the full demolition of existing building No. 1 at the Nora Davis Elementary School Campus. All building elements (foundations, floors, wall roofs, etc.) are to be removed in their entirety. Utility lines shall be removed and/or capped. All built site elements such as walkways, steps, and pedestrian bridges are to be removed as indicated on the drawings. Once demolition is complete, the site will be re-graded as indicated in the drawings to allow positive storm drainage.
Estimated Construction Budget: $12 Million
Addendum No. 01
Addendum No. 02
Addendum No. 03
Addendum No. 04
Addendum No. 05
Addendum No. 06
Addendum No. 07
Addendum No. 08
Pre-Bid Meeting: Wed, 6.30.21 at 1:00 PM at Central Office (Gardiner Campus) Board Room.
Bid Opening: Thu, 7.29.21 at 2:00 PM at Laurel School District, 303 W. 8th Street, Laurel, MS 39441.