22013 Laurel High school Athletic Field house
The renovation of Laurel High School Athletic Field House includes the following items. The existing 6,020SF building will be re-roofed, portions to be replaced with metal roof system and modified bitumen roof system, plumbing, mechanical units and electrical systems are to be replaced, original exterior windows are to be removed and walls infilled. Interior finishes to be replaced. The entrance is new construction consisting of load bearing masonry with metal siding and a modified bitumen roof. Site work is limited to removal of existing chain link fencing and the removal of existing canopy and planter.
Pre-Bid Meeting: Thursday, 06.23.22 at 2:00 p.m. at Central Office (Gardiner Campus) Board Room.
Bid Opening: Thursday, 07.07.22 at 2:00 p.m. at Laurel School District 303 W. 8th Street Laurel, MS 39441