Please note that this is a Dale | Bailey, an Association Project.
20048 - CPS Maintenance Building Reroof
Estimated Construction Budget: $84,000
This project includes a total roof replacement for the Clinton Public Schools Maintenance Building. The areas to be reroofed is the lower and high roof as indicated on the roof plan drawing. The work is to remove existing roofing systems to deck and replace with a modified bitumen system having a 20-year no dollar limit warranty for roof and flashings.
Addendum No. 01
Addendum No. 02
Pre-Bid Meeting: Thu, 7.23.20 at 10:00 AM at Clinton Public Schools, 201 Easthaven Drive, Clinton, MS 39056
Bid Opening: Tue, 8.4.20 at 2:00 PM at Clinton Public Schools, 201 Easthaven Drive, Clinton, MS 39056
Advertisement for Bids
Instructions to Bidders
Project Manuals Table of Contents
Click here to access link to order Bid Documents.