Please note that this is a Dale | Bailey, an Association Project.
20058 - Wisner Gymnasium Demolition, Laurel School District
This project consists of the full demolition of the burned Wisner Gymnasium at the Jones Campus of Laurel Magnet School. All building elements (foundations, floors, walls, roofs, etc.) are to be removed in their entirety. All built site elements such as walkways, steps, and pedestrian bridges are to be removed as indicated on the drawings. Once demolition is complete, the site will be regraded as indicated in the drawings to allow positive storm drainage, and a decorative fence will be erected in accordance with the design documents.
Addendum No. 01
Addendum No. 02
Addendum No. 03
Addendum No. 04
Addendum No. 05
Addendum No. 06
Pre-Bid Meeting: Tue, 2.23.21 at 1:00 PM at Central Office (Gardiner Campus) Board Room.
Bid Opening: Thu, 3.25.21 at 2:00 PM at Laurel School District, 303 W. 8th Street, Laurel, MS 39441.
Advertisement for Bids
Instructions to Bidders
Project Manuals Table of Contents
Click here to access link to order Bid Documents.